My CS-Cart store must leave its current host because they are dropping PHP 7.3 support. I already have a fresh VPS ready that has Spanel. I've already brought over a test copy and tested for bugs; now we just need to plan a full migration of the live copy with our live CS-Cart site. Here’s what I need done: • Copy every file, database, and configuration from the existing server to the new VPS. • Set up and test all DNS records in advance, lower TTL, and flip them at the optimal moment for near-zero downtime. Also need help setting up mail with new DNS setings • Keep Google and other search engines unaware of the move so that it does not effect SEO • Verify that storefront, admin panel, and checkout work perfectly once traffic shifts. Address any issues that may pop up during transfer